IAnswer First, Arithmetic After
The honest answer is that a ring design, custom moissanite - holycome quote is five costs wearing one number. Metal, stone, bench labor, finishing and packing each move for a different reason, and a supplier that will not separate them is asking you to compare a total against a total with no scope attached.
IIYour quotation lists the per-piece price for the confirmed specification.
Use this to audit any quote. If the stone share is far below the row below, the grade moved. Each order is priced individually and confirmed in a written quotation.
| Cost line | Share of piece | What moves it | Who controls it |
|---|---|---|---|
| Metal for the ring design, custom moissanite - holycome | 34% | Alloy choice, shank thickness and casting yield | Factory |
| Stone and melee in ring design, custom moissanite - holycome | 20% | Sieve range, grade band and lot batching | Market plus grade |
| Bench labor per piece | 21% | Setting type, prong count and jig design | Factory |
| Finishing and plating | 15% | Plating micron, polish passes and pre-plate inspection | Factory |
| Packing and the poly bag and printed sleeve | 10% | Pouch, box, print run and carton count | Buyer choice |
A quote with no split is a quote with no scope. Ask for the five lines and the answer will usually tell you which line the supplier was protecting, which is where most ring design, custom moissanite - holycome claims actually start.
IIILine by Line
Where the metal line sits
Metal is the least negotiable line in a ring design, custom moissanite - holycome quote, because it is bought by weight and priced by weight. What a factory controls is thickness and yield: a shank 0.2 mm thinner saves a few percent of metal and costs a resizing later, and a casting yield two points better saves more than any discount conversation. Ask for the gram weight per piece at the quoted size, not for a percentage off.
Where the stone line sits
The stone line is where two quotes for the same drawing diverge by double digits, and almost never because one factory is cheaper. It diverges because one is quoting a grade band and the other is quoting a grade. Ask for the band in writing: color range, clarity range, mm tolerance. The per-piece price is set out on your quote for the agreed specification.
Where the labor line sits
Bench minutes decide the labor share, and the setting type decides the minutes. A prong setting and a bezel on the same ring design, custom moissanite - holycome can differ by several minutes per piece, which at 200 pieces is the difference between one quote and another. Ask for minutes per piece and for the jig that holds the repeat, because a jig is what makes a reorder cost less than the first run.
Where the finishing line sits
Finishing is the cheapest line to specify and the most expensive to skip. Rhodium at 0.20 micron with a palladium strike reads white through a season; nominal plating reads white at the counter and yellow at the third month. We provide itemised per-piece pricing in writing once the specification is confirmed.
Where the packing and freight line sits
Packing is a buyer choice, so it should be quoted separately from the piece. The poly bag and printed sleeve carries a print run, a carton count and a packing list, and all three are priced per order rather than per piece. Freight is the one line that is not a cost of the ring design, custom moissanite - holycome at all, which is why landed cost belongs on a second sheet.
IVWhat Changes Between Bands
| Quantity band | Unit price | What changes |
|---|---|---|
| 50 to 200 pieces | Pricing is quoted per piece in writing based on your specification. | Setup amortised over a small run; gauge and sample already paid |
| 200 to 500 pieces | We quote each design individually in writing against your specification. | Jig and fixture amortised; stone bought in a matched lot |
| 500 pieces and above | Your quotation lists the per-piece price for the confirmed specification. | Dedicated stone procurement and a reserved production slot |
The ladder is arithmetic, not a volume trick. The setup, the gauge and the sample are fixed costs; the metal and stone are not. Each order is priced individually and confirmed in a written quotation.
A buyer comparing a 50-piece quote with a 500-piece quote is comparing two different products. The per-piece price is set out on your quote for the agreed specification.
We provide itemised per-piece pricing in writing once the specification is confirmed.
VFive Costs That Arrive After the Quote
- Return freight on a rejected tray, which is charged by the courier and not by the factory, and is the line buyers forget when they compare two quotes.
- Re-plating or re-polish after a season, when nominal plating wears through on a fast-moving SKU and the piece comes back through the counter rather than the factory.
- Reship on a sizing drift, because a run that drifts 0.3 mm across sizes produces a second shipment for the same order.
- The certificate you did not ask for at the quote stage, priced at the moment a marketplace or a customs broker asks for it, which is always the expensive moment.
- The air freight to protect a launch date, charged at four to six times the ocean rate, and usually caused by a sample approved two weeks later than the calendar allowed.
These are not hidden in a dishonest sense. Pricing is quoted per piece in writing based on your specification.
VIFrom Factory Price to Retail
| Line | Amount per piece | Note |
|---|---|---|
| Factory price per piece | We quote each design individually in writing against your specification. | Ex-works, packing included, certificate per the quote |
| Freight and duty allocation | Your quotation lists the per-piece price for the confirmed specification. | Ocean at 200 pieces; DDP quoted separately |
| Landed cost | Each order is priced individually and confirmed in a written quotation. | The number your retail multiple has to clear |
| Retail at 3.0x | The per-piece price is set out on your quote for the agreed specification. | Typical for a boutique with a 55 to 60 percent margin |
A three-times multiple on landed cost is the working assumption for a US boutique; below 2.6 the ring design, custom moissanite - holycome has to carry the marketing itself. That is why the factory band matters more than the discount.
The multiple is not a pricing opinion, it is a cash constraint. Pieces that sit for two seasons need a higher multiple to pay for the floor space, and pieces that reorder need a lower one, which is where most ring design, custom moissanite - holycome claims actually start.
Run the arithmetic on the band you will actually order, not on the 500-piece band you hope to reach. We provide itemised per-piece pricing in writing once the specification is confirmed.
VIIFrequently Asked Questions
Pricing is quoted per piece in writing based on your specification.
Stone documentation is prepared according to your order sheet and confirmed on the quote. Your quotation lists the per-piece price for the confirmed specification.
Why do two suppliers quote the same design so differently?
Almost always the stone grade band or the bench minutes. We quote each design individually in writing against your specification.
Can the metal line be reduced without losing quality?
Yes, by 0.2 mm of shank thickness or by a lighter hollow section, at the cost of resize work later. We quote both and state the trade rather than choosing it for the buyer, which is where most ring design, custom moissanite - holycome claims actually start.
How much does plating thickness change the price?
Vermeil at 3 microns costs more than rhodium at 0.20 micron, and both cost less than the re-plating a nominal finish triggers. Your quotation lists the per-piece price for the confirmed specification.
Do you quote landed cost?
Yes, as a separate line with the duty assumption stated. Each order is priced individually and confirmed in a written quotation.
VIIINext Step
The per-piece price is set out on your quote for the agreed specification.
Wuzhou HengliLai Jewelry Co., Ltd. Casting, setting, polishing and QC are handled in-house at our Wuzhou workshop. Because casting and setting sit in the same building, a gauge change on the bench reaches the next tray the same week rather than the next shipment. Quotes, drawings and inspection sheets go out from service@holycome.com, or WhatsApp +86 133 7744 7107.
Related reading: Ring Design, Custom Moissanite - HOLYCOME Private Label: Three Routes, Six Criteria - HOLYCOME Engagement Rings, Custom Moissanite - HOLYCOME Bridal Boutique: AQL, Tray Checks and - HOLYCOME