IFrom Sketch to Schedule
When you drop a sketch into our inbox, we’re on it within a day. We confirm feasibility, set a realistic manufacturing window, and outline any design constraints before you spend a cent. This upfront clarity keeps costs transparent and prevents surprises during production.
Once you hit “approve,” the 50 % deposit opens your slot on our calendar. With a single‑piece minimum for stock items, we slot your order right after your approved drawing, ensuring a smooth, predictable lead time of 12‑18 days from start to finish.
IIScaling the Concept
Our design team turns your concept into a 1:1 scaled drawing that matches your specified dimensions. This ensures the final piece fits perfectly in its intended environment and eliminates scale‑related errors before the setting stage.
We share the drawing with you for written approval, giving you the chance to tweak proportions or details. Only after your sign‑off does the first prototype go into production, guaranteeing the design matches your vision exactly.
IIIMaterial Choices at a Glance
| Component | Material Options | Finish | Lead Time |
|---|---|---|---|
| Stone | Moissanite, Lab‑grown diamond, Brio | Polish, Cut | 7–10 days |
| Setting | 925 Silver, Gold‑plated, Platinum | Plain, Engraved | 3–5 days |
| Mount | Base, Stand, Hanging | Polished | 2–4 days |
Your choice of material affects both the aesthetic and the cost. Every material passes our three‑stage QC before it’s added to the build queue.
We also provide GRA and IGI certificates upon request, giving you official assurance of quality and authenticity for your trade documentation.
IVProduction Lead‑Time Calendar
Once the drawing is approved, we schedule the 12‑18 day window. Day 1 begins with setting the stone, followed by polishing and mounting. Each phase is tracked against our calendar to keep every client informed.
Our factory line runs eight hours a day, with production slated to finish within the 18‑day window for bulk orders. Single‑piece stock items hit the same window, thanks to our flexible scheduling system.
VQuality Assurance in Three Stages
- Incoming stone inspection for cut, color, and size.
- In‑process check of setting alignment and polish.
- Pre‑ship AQL test for durability and light output.
Only after all three stages are cleared does the piece leave the factory. This rigorous process ensures a first‑pass yield that outperforms typical trading partners by 20 %.
Our QC team documents each step with photos and videos, sending stage updates to your contact via email or WhatsApp for full transparency.
VIDelivery and Post‑Production Support
All finished pieces ship DDP, with a delivery window of 5–8 days to the U.S. Standard freight costs are included in the final invoice, leaving you with a single, predictable expense.
If you need samples before committing, we accept PayPal for the 30 % deposit. For larger orders, a T/T arrangement is preferred. Once you’re satisfied, we issue the final invoice and arrange shipping.
VIIFrequently Asked Questions
What is the minimum order quantity for custom designs?
The MOQ for custom orders is 30 pieces, but stock items can be ordered in single units. This flexibility lets you test a new line before scaling up.
How long does the production lead time usually take?
Our custom production lead time is 12‑18 days from drawing approval. Stock items follow the same schedule, ensuring consistent timing for all products.
Can I see a certificate for the material used?
Yes, we provide GRA or IGI certificates on request. These documents accompany the final shipment and are crucial for trade compliance.
Ready to start your custom line? Contact us at service@holycome.com or WhatsApp +86 133 7744 7107 for a quote or sample request.